Terms of Service
Last Updated: November 2026 • Aerkai India
1. Acceptance & Eligibility
By registering an account, linking a smart meter, or conducting transactions on the Aerkai platform, you certify that you are at least 18 years of age, legally capable of entering into binding contracts, and authorized to represent the premises or commercial entity receiving the metered utility service.
2. Description of Aerkai Services
Aerkai India provides end-to-end smart metering, IoT telemetry, and cloud utility infrastructure, including:
- Smart single-phase and three-phase electricity and ultrasonic water meters.
- Cloud-hosted consumption analytics, multi-slab billing calculation, and remote latching relay operation.
- Digital interfaces for consumer payment collection and real-time consumption auditing.
- Automated switching registers for Main Grid and Diesel Generator (DG) power sources.
3. Consumer Responsibilities & Prohibited Conduct
All users and consumers agree strictly to:
- Maintain an adequate prepaid wallet balance to ensure uninterrupted power supply, subject to emergency credit limits.
- Protect meter hardware against physical damage, unauthorized access, or hazardous environment exposure.
- Zero Tolerance for Meter Tampering: Any attempt to bypass, tamper with optical seals, introduce external high-strength magnetic fields, alter neutral loops, or execute reverse current injection constitutes a criminal offense under applicable electricity regulatory acts and will trigger immediate automatic supply isolation and statutory reporting.
- Ensure account credentials, login OTPs, and authentication keys are kept confidential.
4. Cloud Platform Availability & SLA
Aerkai targets a 99.9% uptime for our cloud telemetry servers and backend services. In the event of temporary cloud disconnection or cellular network carrier outages, Aerkai meters continue autonomous local energy recording and will not disconnect supply arbitrarily unless local meter emergency thresholds are breached.
5. Tariff Calculation & Fixed Utility Surcharges
Energy tariffs, slab rates, DG surcharges, fixed infrastructure maintenance fees, and common area maintenance (CAM) deductions are configured by your designated Housing Society / RWA or Utility Administrator.
Aerkai acts as the computational engine and technology facilitator executing configured mathematical formulas accurately. Aerkai is not an electricity distributor and does not independently fix electricity tariff rates.
6. Intellectual Property Rights
All software code, user interface designs, logos, trade secrets, telemetry protocols, and hardware schematics related to Aerkai (including the "ai" logomark and brand name) are the exclusive intellectual property of Aerkai India. No reverse engineering, decompilation, or unauthorized derivative work is permitted without prior written consent.
7. Limitation of Liability
To the maximum extent permitted by applicable law, Aerkai India and its directors, employees, and affiliates shall not be liable for any indirect, incidental, punitive, or consequential damages resulting from municipal grid power blackouts, scheduled load sheddings, or power disconnection triggered by complete prepaid balance exhaustion following due notice.
8. Governing Law & Dispute Jurisdiction
These Terms shall be interpreted and governed in accordance with the laws of India. Any unresolved dispute arising out of or in connection with these Terms shall be subject to the exclusive jurisdiction of the competent courts in India.
9. Legal & Regulatory Inquiries
For legal inquiries, contract clarifications, or regulatory compliance requests:
MAIN BRANCH :- NIT Faridabad, Haryana, India
Phone: +91 9953530158 • Email: [email protected]